April 11 Build Day
Posted on April 11th, 2009 by sudburyhabitat
More drywall on the ceiling — this time starting on the first floor. Plus starting on a few interior walls.
Also, an interior window space was created in the wall between Meg’s kitchen and living room, stairs were built into the basement from the bulk head on Michelle’s side, some exterior cleanup and preparation for some leach field excavation work next week, and more….
Check out some photos here:
![]() |
| Click above for the photos… |
Filed under: Build Day