February 7 Build Day
Posted on February 7th, 2009 by sudburyhabitat
Today saw windows finished on the second floor, and one side door installed — the house is almost entirely enclosed (NOW we’re ready for the snow and cold!)
Also today: framing of a lot of walls on the second floor of the 2-bedroom unit, firewall framing finished, jacking up of a beam, and more….
![]() |